ISE 5345 - Network Analysis
Engineering project planning using such techniques as PERT and critical path method, resource allocation in project networks, shortest path models, spanning-tree problems, traveling salesman problems, maximum-flow problems, and other stochastic network models, such as GERT.
Requisites Credit Hours: 2.0 Repeat/Retake Information: May not be retaken.
Lecture/Lab Hours: 2.0 lecture